Muğla · based in Ortaca / Dalyan

Renovation, facades, roofs and pools in Muğla. One team from stone to timber.

Across Muğla and the surrounding area, the same team from survey to handover. What is done, with which materials and in which order is written down up front.

On-site surveyWritten scope of workStep-by-step updatesReach us on WhatsApp
Taş ve ahşap verandaTimber deck
Konut ve ahşap veranda
A-frame ahşap iç mekân
On-site surveyStarts with measurements and photos
Written scope of workMaterials and order are clear
Stone and timberDecks, tiny houses, restoration
Local knowledgeClimate, permits, local conditions
Problem check

What is wrong at home?

Pick one or more: see likely causes, a first check and the right service.

Services

What would you like done?

Open a card to see the process and what to prepare.

Roadmap

What is it time for? How will your job run?

Your roadmap

Durations are confirmed at the survey; only the sequence is shown here.

Process

Five steps, clear from the start

01

Survey

On-site measuring and needs discussion.

02

Quote

Written scope, materials and timing.

03

Planning

Schedule, materials, permits if needed.

04

Execution

Progress updates at each stage.

05

Handover

Checklist and cleaning.

Survey & quote

Describe your job in five short steps

Your message arrives ready; reach us on WhatsApp with one tap. Send photos in the chat.

Areas we serve

Choose your district

Each district has its own page.

FAQ
Can we stay in the home during renovation?

Depends on scope. Usually not for full renovations; partial jobs are phased room by room. We confirm at the survey.

Can insulation be applied over cracks?

The cause is identified first. If structural concerns exist, an engineer’s opinion is needed before preparing the surface.

Should I climb on the roof to look?

No. For your safety take photos from the ground; we inspect the roof during the survey.

How do I tell if the pool loses water?

Mark the water level at the same time each day and photograph the plant-room fittings; the leak point is found by on-site testing.

Does wood hold up in Muğla’s climate?

It depends on material and protective finish; we state which product we choose and why in the quote.

Does a tiny house need a building permit?

It depends on the land’s zoning and the nature of the structure; no general answer is possible. We first check the parcel status together.

When should garden work start?

Spring and autumn are generally suitable for planting; ground and infrastructure work can be planned earlier.

Do listed buildings need permission?

Depending on registration status, approval from the relevant authority may be required. We clarify the process together; the decision rests with the authority.

CallMessage on WhatsApp
Tell us the problem and we’ll prepare your quote message together.